Marbella · Costa del Sol

Pools & outdoor living

Pools, terraces, shaded lounges, outdoor kitchens and landscape become a year-round extension of the villa, designed for Marbella's climate and coastal conditions.

A service defined around the property

What we do and how we protect the result

Pools, terraces, shaded lounges, outdoor kitchens and landscape become a year-round extension of the villa, designed for Marbella's climate and coastal conditions.

01

Pool architecture and engineering

Geometry, levels, structure, hydraulics, heating, covers and finishes are designed as one system.

02

Shade and year-round comfort

Pergolas, orientation, airflow, lighting and heating extend the useful season of outdoor spaces.

03

Outdoor cooking and entertaining

Kitchens, bars, dining and service routes are planned with durable equipment and practical storage.

04

Landscape that belongs to the villa

Planting, irrigation, drainage and night lighting reinforce architecture while controlling maintenance.

Becker Projects

Clear cost control

Budget, appointments, changes and forecasts remain documented throughout the project.

01

Clear accountability

One project lead coordinates information, specialists and decisions without gaps in responsibility.

02

Verified quality

Workmanship, materials and snagging are inspected; quality is verified rather than assumed.

03

International owners

Clear milestones, structured reporting and one multilingual point of contact keep every decision visible wherever you are.

04

Project overview

Geometry, levels, structure, hydraulics, heating, covers and finishes are designed as one system. Pergolas, orientation, airflow, lighting and heating extend the useful season of outdoor spaces.

Pools & outdoor living

A controlled journey from idea to handover.

01

Discover

Property, ambitions and priorities.

02

Define

Survey, concept, scope and investment.

03

Deliver

Licences, construction and reporting.

04

Handover

Quality control, documentation and keys.

Project concept

Pools & outdoor living · Marbella

Pools, terraces, shaded lounges, outdoor kitchens and landscape become a year-round extension of the villa, designed for Marbella's climate and coastal conditions.

Kitchens, bars, dining and service routes are planned with durable equipment and practical storage. Planting, irrigation, drainage and night lighting reinforce architecture while controlling maintenance.

FAQ

Common questions

What is checked before renovating an existing pool?

Structure, cracks, glass, waterproofing, crown, pipes, delivery, suction, filtration, technical room and environment are inspected. The urban situation, elevations, drainage and security are also checked. Losing water does not necessarily mean that the coating fails: it can come from pipes or embedded parts. Diagnosis and tests allow you to decide between localized repair, renovation of facilities or complete intervention.

Does a new pool or its transformation need a license?

It depends on the action and the municipality. A new pool, changes in dimensions, structure, location, walls or earthworks may require a project, license or other authorizations. Even a renovation must respect regulations and possible conditions. The technician confirms the procedure with the City Council before contracting dates or starting excavations; A simple finish replacement does not equate to a structural transformation.

Skimmer or overflow pool: which one is best?

The skimmer typically requires less hydraulic work and keeps water below the crest. An overflow system offers visual continuity and collects surface uniformly, but requires a channel, compensation tank, precise leveling, technical space and hydraulic control. The choice depends on architecture, slope, wind, budget, noise and maintenance, not only the desired photograph.

Does saline chlorination mean that the pool does not use chlorine?

No. The equipment generates disinfectant from dissolved salt; It is still necessary to control disinfection, pH, alkalinity, stabilizer and water balance. Salinity also influences nearby metals, stone and equipment, so compatible materials are selected. Automating dosing facilitates control, but does not eliminate analysis, cleaning or maintenance of the system.

How are filtration and circulation sized?

Volume, use, climate, vessel shape, pressure losses, admissible speed, number and position of impulses and suctions, filter, pump and treatment are considered. More powerful equipment does not correct poorly designed hydraulics and may increase consumption or noise. Access is provided to the technical room, drainage and maintenance space. Entrapment safety and electrical protections are part of the design.

Is it efficient to heat an outdoor pool?

It depends on the target season, volume, exposure, desired temperature and energy source. A cover greatly reduces evaporation and losses; Then the heat pump or other system is sized according to loads, not by volume alone. Wind, insulation and schedule are also studied. Without cover and control, maintaining a high temperature can generate consumption and evaporation much higher than expected.

How are pool, terrace, garden and drainage coordinated?

Levels and slopes are designed so that rain, irrigation and bath water do not enter the villa or drag dirt into the pool. Gutters, permeable surfaces, walls, roots, irrigation, lighting and service routes are coordinated. The vegetation is chosen for climate, water, leaves and proximity to the glass. Architecture and landscape must share a level plan before executing the first slab.

What security measures should be considered?

In addition to the applicable regulations, unsupervised access, barriers or covers, non-slip flooring, lighting, depth, steps, visibility, electricity and aspiration systems are evaluated. No barrier replaces the supervision of minors. The measures must be adapted to the users and use of the home, and delivered with operating and emergency instructions. Safety and aesthetics are better integrated when designed from the beginning.

How long does a complete pool and outdoor renovation take?

It depends on the diagnosis, authorizations, structure, waterproofing, installations, landscaping and curing. The program coordinates buried work before paving and planting, as well as testing before covering pipes. Stone, equipment or special parts may take a long time to manufacture. A reliable date is prepared after defining scope and sequence, including filling time, water balancing and start-up.

What documentation and training is provided?

Final plans or diagrams, pump, filter, treatment, air conditioning and lighting sheets, guarantees, initial parameters and maintenance schedule are gathered. Backwash, cleaning, dosing, alarms and seasonal operation are explained. Tests and any reviews are also documented. The owner or maintainer must understand the system; A technically good pool can perform poorly if operated without instructions.

Pools & outdoor living · Marbella

Tell us about your villa.

Share the first details and we will arrange a private project consultation.